SHENZHEN RUIZI LIGHT ELECTRICITY TECHNOLOGY CO.,LTD
SHENZHEN RUIZI LIGHT ELECTRICITY TECHNOLOGY CO.,LTD
24w 1.5m Fixture integrated led t5
  • 24w 1.5m Fixture integrated led t5
24w 1.5m Fixture integrated led t5

24w 1.5m Fixture integrated led t5

Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Product Description
Product Description
  • Product Details

Basic Specification

CRI >80
PF/Power Efficiency >=0.93/>=0.87
LED QTY 240pcs
CCT Range 3000~6500K
Light Source 3528
Life 50000hours
Power 24w
Lamp Base G5
Lumen 2280~2520lm
Tube Diameter T5
Voltage 90-260V
Color Tones Pure White
Length 150cm

Detail Description

Product Advantage

1.Easy Installation: can be placed in conventional T8 or T10 fluorescent brackets and easily replace them.
2.The Isolated Driver ensure:our tube instant on no flickeringand and high brightness And life time more than 50,000 hours.
3.Aluminum better heat dissipation than FR4 and environment friendly.



Q1:Why ERVAN?

A:1.OEM factory,exported all over the world from 2005,have research and development capability;
2.Good quality LED chip,good led,good driver supply isolated,good electronic packaging.and high lumen output but the lowest power consumption.5 years guarantee;
3.Security, no dangerous of electric shock or leakage;
4.Reliable reputation, and 150,000~200,000 production to ensure the delivery time;

5.DLC/VDE/TUV/UL/CE/ROHS certification;
6.Cooperate with many big companies with strength, by they all consistent high praised;
7.Patented 180Deg rotating end cap design for the best lighting results;
8.Aluminum PCB better heat dissipation than FR4;
9.Same quality service,deal with your problem immediately.

Q2:How to aging your products?

A:We aging our led tube at least 8 hours before they leave factory.

Q3:What are your terms of delivery? (How many days do you usually produce the goods? Port of loading?)

A:1)Sample order10pcs:5~10days
2)Under 500pcs,10~15 days
3)500-1000pcs,15~20 days
4)1000-5000pcs,20~25 days
5)under 5000pcs,30~35 days
Port of loading:FOB shenzhen

Q4:
Terms of payment?
 
A:TT(100% prepaid for order amount<US$25,000)
L/C(50% prepaid by TT and the rest 50% by L/C for order amount>US$50,000)

Q5:Will it be possible to print our logo and TM on your goods?

A:Yes,we could.For led tube is the rule like that MOQ 100pcs for customized your laser print,
and MOQ 500pcs for customized your box label.

Additional Information

Payment Terms L/C, T/T
Minimum Order 10pcs
Lead Time / Delivery Time 25 Day(s)
Sample Available YES
Delivery Details Samples:7-9 Days, Mass Production : 20-30 Days Air, Sea or Express Any way can reach you.
FOB Port Shenzhen
Loading Info Air, Sea or Express Any way can reach you.FOB Shen Zhen or Hong Kong
Packing Info 25PCS/Inner Box, 50PCS/Carton:600mm: 74*47*26cm/Carton1200MM:135*47*26cm/Carton 1500mm:165*47*26cm/Carton
Target Market(s) Africa(except Middle East), Eastern Europe, Hong Kong/ Macao/ Taiwan, Japan & Korea, Latin America, Middle East, North America, Northern Europe, Oceania, Central & Southern Asia, Southeast Asia, Western & Southern Europe

Send your message to this supplier

  • Mr. Anne

  • Enter between 20 to 4,000 characters.

Related Keywords

Related Keywords