Shenzhen Isource Engineering Co., Ltd.
Shenzhen Isource Engineering Co., Ltd.
40-400W UL Dlc TUV SAA 110lm/W Meanwell Driver 120W Light LED Tunnel Fixture
  • 40-400W UL Dlc TUV SAA 110lm/W Meanwell Driver 120W Light LED Tunnel Fixture
40-400W UL Dlc TUV SAA 110lm/W Meanwell Driver 120W Light LED Tunnel Fixture

40-400W UL Dlc TUV SAA 110lm/W Meanwell Driver 120W Light LED Tunnel Fixture

Payment Type:
L/C, T/T, Paypal, Western Union
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: Shenzhen, Guangdong
Payment Type: L/C, T/T, Paypal, Western Union
Product Description
Product Description
Welcome 40-400W UL DLC TUV SAA 110lm/w Meanwell Driver 120w light led tunnel fixture:  
Model DS-3104 led tunnel fixture:

1, led tunnel fixture features:

1. Supporting 120W lamp's cooling.

2. Dustproof design, Waterproof design(IP65).

3. Compared to traditional LED heatsink, our dissipating area is bigger, air convection is better.

4. With casette structure, its easy to install led lighting, efficient for mass production.

5. The cooling structure is under patent protection (included the appearance).


2, led tunnel fixture specifiction :

1. Cree/Bridgelux/Epistar 
2. Lifespan: >50000h 
3. Warranty: 5years 
4. CE FCC RoHS certificates 
40-400W UL Dlc TUV SAA 110lm/W Meanwell Driver 120W Light LED Tunnel Fixture


3.Application of led tunnel fixture:

Widely used in Bridge's culverts, tunnel, landscape lighting, etc.
 40-400W UL Dlc TUV SAA 110lm/W Meanwell Driver 120W Light LED Tunnel Fixture

     

4.Why Choose Us: 

Production operations In strict accordance with the ISO9001: 2008 standard, Strictly control every production detail to steadily improve product quality.

40-400W UL Dlc TUV SAA 110lm/W Meanwell Driver 120W Light LED Tunnel Fixture

5.Our service:

MOQ & Supply Ability:

100pcs/order,2000PCS/Week.
 

6.Cooperation: 

We are looking for Agent in the world and we are willing to offer ODM & OEM service for our customers. It's our great honor to cooperate with you based on equality and mutual beneficial

 

7.led tunnel fixture payment term:

1) payment:by T/T or Western Union,100% payment if the total amount is less than USD2,000,30%deposit and 70% balance before shipment if the total amount is more than USD2,000

2)Lead time:3-5days for samples and 7-12days for bulk order

3)Delivery ways:DHL,EMS,UPS,TNT door to door service,by sea,by air,etc

4) MOQ:10-100pcs

  

For more 40-400W UL DLC TUV SAA 110lm/w Meanwell Driver 120w light led tunnel fixture, please contact Apollo Zheng freely. Thank you! 

Mob:+86 135 5470 2799     URL: www.isourceled.com   S: doctor.newray


Send your message to this supplier

  • Mr. Gavin Guan

  • Enter between 20 to 4,000 characters.

Related Keywords

Related Keywords