Shenzhen Welmetal Heavy Industry Co. Ltd
Shenzhen Welmetal Heavy Industry Co. Ltd
Welded Beam with OHSAS18001 Mark, 3,000 Tons Fabrication Capacity
  • Welded Beam with OHSAS18001 Mark, 3,000 Tons Fabrication Capacity
Welded Beam with OHSAS18001 Mark, 3,000 Tons Fabrication Capacity

Welded Beam with OHSAS18001 Mark, 3,000 Tons Fabrication Capacity

Payment Type:
T/T or L/C
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Payment Type: T/T or L/C
Product Description
Product Description
  • Fabrication capacity: 3,000 tons a month
  • Experience: 20 years, established in 1989
  • Quality certificate: OHSAS18001
  • Fabrication standards: GB50205: 2002, AS/NZ4100, EN9001, AWSD1.1, D1.4, D1.5
  • Workshop area: 6 large span workshop 27 x 189 meters in 25,000 square meters
  • Projects fabrication scope: steel structures of constructions, infrastructure, equipment, such as airport, metro, bridge, hydro power station, stadium, equipment, warehouse, platform, stadium box beam, box column, welded beam, welded I beam, H beam, channel, butt weld, welded girder, girders and bracing, truss, bracing, curved truss beam, main and secondary truss beam steel structure, warehouse, buildings, equipment mold, steel dowel, screw pile, tower, steel frame and more
  • Production line machines: automatic arc submerge welding machines, CNC cutting machines, blasting machines, drilling machines, carbon dioxide arc welding machine, 32T cranes, press machine, purlin machine, H-beam strengthen machine, shearing stiffener cutting machine, blasting machine, assembling machine and more
  • Material: material trace ability, provide steel mill certificate
  • Welding processing and testing: fillet welding, full penetration welding, ultra-sonic test
  • Coating treatment: galvanized, zinc rich epoxy primer
  • Inspection and testing: UT, tensile strength, bending, chemical composition analysis, dimensions tolerance, coating and more
  • Qualification: WPS, weld workers operating certificate, NDT inspector, the third party
  • Packing: packing plan is confirmed by supplier and client, steel frame, wood, steel strip, pallet, box
  • Transportation: by containers or bulk carrier
  • ITP technical requirement from client
  • Send your message to this supplier

    • Mr.  Lewis

    • Enter between 20 to 4,000 characters.

    Related Keywords

    Related Keywords