Shenzhen Guangshenfa Metal Co., Ltd
Shenzhen Guangshenfa Metal Co., Ltd
Hot Work Mould Steel Round Bar (H13/DIN1.2344/SKD61)
  • Hot Work Mould Steel Round Bar (H13/DIN1.2344/SKD61)
Hot Work Mould Steel Round Bar (H13/DIN1.2344/SKD61)

Hot Work Mould Steel Round Bar (H13/DIN1.2344/SKD61)

Payment Type:
T/T, Western Union
Incoterm:
CFR
Min. Order:
500 Kilogram
Min. Order:
500 Kilogram
Delivery Time:
7 Days
Transportation:
Ocean, Land, Air
Quantity:

Your message must be between 20 to 2000 characters

Contact Now
Basic Info
Basic Info
Place of Origin: shenzhen
Productivity: 1000 ton per month
Supply Ability: 1000 ton per month
Payment Type: T/T,Western Union
Incoterm: CFR
Transportation: Ocean,Land,Air
Product Description
Product Description
Hot Work Mould Steel Round Bar (H13/DIN1.2344/skd61 )


hot work mould steel round bar H13/DIN1.2344 /skd61 alloy tool steel detailed products description:

Tool steel H13/DIN 1.2344/SKD61/4Cr5MoSiV1

Round size:
diameter:20-350mm length:2500-4000mm or customer requested.

Factory state: soft annealing to HB 185. skd61 alloy tool steel

Comparable Standards:

AISI/SAE
DIN W.Nr. AFNOR JIS BS SIAU GB,YB

H13

X40CrMoV51
1.2344 - SKD61 BH13 MTV -


Chemical Analysis (%):

C
Mn Si Cr V Mo P S
0.37-0.42 0.30-0.50 0.90-1.20 4.80-5.50 0.90-1.10 1.20-1.50 ≤0.03 ≤0.03


Heat treatment
Isothermal annealing:
- Heat to 880°C, hold at temperature for 1/2 h to 1 h;
- Furnace cooling to 780°Cand hold at temperature for at least 5 hours;
- Cool by 10°C/h to 750°C;
- Cooling in air.
Maximum hardness: 230 HB
Stress relieving:
To be carried out after maching and before the final heat treatment.
- Heat to 650÷700°C, hold for 4÷6 hours;
- Furnace cooling to 300÷350°C;
- Cooling in air.
Hardening:
- Initial preheating to 350÷450°C;
- Second preheating to 750÷850°C;
- Heat to hardening temperature in the range 1000÷1050°Cand hold at temperature;
- Cooling in air.
Quenched hardness: 52÷56 HRC
Tempering:
In the range 550÷630°Cfor at least 3 hours according to hardness requirements and conditions of use.
Tempering must be repeated a second time at a temperature to or 20°Clower than the previous.
Before tempering, preheat the parts to 200÷300°C.

Send your message to this supplier

  • Ms. Alice

  • Enter between 20 to 4,000 characters.