
Fully automatic Cling film machine production
- Payment Type:
- L/C, T/T
- Incoterm:
- FOB, CIF
- Min. Order:
- 1 Set/Sets
- Min. Order:
- 1 Set/Sets
- Delivery Time:
- 60 Days
- Transportation:
- Ocean
Quantity:
Your message must be between 20 to 2000 characters
Contact NowBasic Info
Basic Info
Place of Origin: | Shenzhen, China |
---|---|
Productivity: | 280kg/ h |
Supply Ability: | 20-25 sets/ month |
Payment Type: | L/C,T/T |
Incoterm: | FOB,CIF |
Certificate: | CE, ISO9001:2008 |
Transportation: | Ocean |
Product Description
Product Description
Product Description
CL-65/90/65C 1500mm Three-Layer /FIve-Layer Co-Extrusion Intelligent Automatic Cling Film Machine |
Characteristic:
1.The cooling roller adopts a large-diameter special flow path roller to improve he cooling effect in high-speed production and ensure uniform temperature of the surface of the cooling roller. |
2.The special alloy screw design adopts high plasticization and crystal point treatment structure to ensure that the extruded film is more stable,uniform,high transparency, strong tensile force and better viscosity. |
3.The entire production line realizes fully automated production.On the basis of the original automatic material change and reeling , the auotomatic paper feeding tube and the automatic unloading finished system are added to ensure high quality and stable production , which greatly saves the labor cost of production. |

4.The whole machine parts and electrical control parts are made of domestic and foreign famous brand products to ensure stable operation and low failure rate. |
5. The unit uses melt metering pump technology with a precision sensing force system for stable and efficient pressure control ,which greatly increases the longitudinal and lateral tensile forces of memberance and the puncture resistance of the membrane. Make the finished product more rigorous to meet the strict requirements of the machine film. |
6.This equipment can produce 8 microns cling film. |
Application
The film can be widely used in wrapping of pallet packaging,storage packaging,manual packaging and so on.
Certificate
The company is a national high-tech enterprises
This product has passed the CE certification and ISO certification
Workshops
1.High Precision CNC Machine Tools |
2.CNC Machining Center |
3.High Precision Machining Machine |
Packing & Delivery
After-sale
Warranty period and testing procedure:
The seller freely provides the fittings during the warranty for 12 months with the maintenance forever
when the equipment is tested OK. (Human factor and force irresistant factor exception.)
The seller provides the debugging and setting, Seller free to provide about one week training
but provide the round-trip ticket , other traveling costs should be paid by buyer.
Related Keywords
Related Keywords
You May Also Like
You May Also Like